Winter 2003/04
I completed several projects over the winter.
Moved head unit
from top of dash to lower dash centre panel
Installed SPA gauges
- Boost/EGT, Fuel Pressure/Intake Air Temp, Oil Pressure/Oil Temperature
Installed Mocal 13 row oil cooler
with take-off sandwich plate, oilstat, oil temperature take of and Mocal stainless braided hoses with Aeroquip Pro-Clamps
Filled gearbox with Redline MTL